Projects

Portfolio · Completed projects

Completed Projects

Contracts delivered since 2014 for public and private clients across Mauritania.

12+
Contracts completed since 2018
126M+ MRU
Total volume of works
2014 – 2026
Period of activity
Toujounine School Infrastructure
Building & CECompleted

Toujounine School Infrastructure

Client : TAAZOUR Delegation

Role : Sole contractor

Rehabilitation, extension and construction of school infrastructure in the Toujounine area (LOT 5).

  • Gaza School
  • Toujounine VI School
  • Bad reding School
2025
Secondary School in Degvegh
Building & CECompleted

Secondary School in Degvegh

Client : TAAZOUR Delegation

Role : Sole contractor

Complete construction of a secondary school in Degvegh including classrooms, the administrative block, sanitary blocks and external works.

  • Classrooms
  • Administrative block
  • Sanitary blocks
2024
Boussteila Primary School
Building & CECompleted

Boussteila Primary School

Client : TAAZOUR Delegation

Role : Sole contractor

Construction of a primary school (Lot 8).

  • 6 classrooms
  • Administration
  • Head teacher and caretaker lodges
2022 - 2023
BACAR SOUEIDEHMED School
Building & CECompleted

BACAR SOUEIDEHMED School

Client : MHUAT

Role : Consortium (Lead)

Extension of school infrastructure in Nouakchott South (ARAFAT) LOT 3.

  • 8 new fully-equipped classrooms
2023
5 Modern Poultry Farms
5 Modern Poultry Farms
Building & CECompleted

5 Modern Poultry Farms

Client : Ministry of Livestock

Role : Sole contractor

Construction of modern breed-improvement farms (Lot 1) in Hodh El Chargui.

  • 1,987 m² barn with metal frame
  • 18 enclosures
  • 30 m³ water tower
2021 - 2022
Sebkha 2 High School
Building & CECompleted

Sebkha 2 High School

Client : TAAZOUR Delegation

Role : Sole contractor

Construction of a large school complex.

  • 2 blocks of 8 classrooms (16 in total)
  • 1 administrative block
  • 1 technical block
2020 - 2021
Mechanical Dune Fixation
Mechanical Dune Fixation
EarthworksCompleted

Mechanical Dune Fixation

Client : ANGMV / Min. of Environment

Role : Sole contractor

Major environmental works across 8 lots (Brakna, Maghta Lahjar, Boumdeid, Baghdad).

  • Earthworks and development
  • Mechanical fixation of dunes
  • Fencing over a total area of 160 hectares
Feb 2022 - Mar 2022
Boubleine Lekhraiza Dam
Boubleine Lekhraiza Dam
HydraulicsCompleted

Boubleine Lekhraiza Dam

Client : EU / Enabel / RIMDIR

Role : Consortium (Lead)

Civil engineering and hydraulic works for the restoration and repair of the Boubleine Lekhraiza dam.

  • Securing water resources for local populations
Dec 2023 - May 2024
Hydraulic Works LOT 2
Hydraulic Works LOT 2
HydraulicsCompleted

Hydraulic Works LOT 2

Client : EU / Enabel / RIMDIR

Role : In consortium

Construction and rehabilitation of water mobilization structures for agro-pastoral use.

  • Assaba
  • Guidimakha
  • Hodh el Gharbi
2020 - 2021
Paint Factory
Paint Factory
Building & CECompleted

Paint Factory

Client : Universelle Peinture

Role : Sole contractor

Complete construction of an industrial production plant.

  • Large shed with metal frame
  • Administrative offices
  • Refreshment area and sanitary blocks
Feb 2022 - Jul 2022
Major Earthworks
Major Earthworks
EarthworksCompleted

Major Earthworks

Client : The Arab Contractors

Role : Sole contractor

Execution of large-scale earthworks for a major project.

  • Treated area: 155,629 m²
  • Volume moved: 130,742 m³
2018
R+1 Villa with Pool
R+1 Villa with Pool
Building & CECompleted

R+1 Villa with Pool

Client : Private Client

Role : Sole contractor

High-end residential construction in Nouakchott.

  • Full basement
  • Ground floor + upper floor (R+1)
  • Luxury external works
Completed